Mon - Fri 9:00 am - 5:00 pm
Menu Categories

No products in the cart.

Victron Energy Meter ET112

R964.87 Incl. VAT

32 people are viewing this product right now
1-phase, max 100A
Please, activate Compare option to use this widget.
Estimated delivery:5 days
SKU: 3800700056 Categories: ,

Victron Energy Meter ET112

The Victron ET112 (for single-phase max. 100A) Energy Meter is typically used in a Victron Energy Storage System, to measure the power and energy of the whole application at the distribution box. Or to measure the output of a PV Inverter, to display the data on the Color Control GX and the VRM Portal.

For three-phase systems, use the Victron ET340 meter.

The Victron ET112 Energy Meter can be used for:

      • Grid meter, and used as control input for a Victron ESS System.
      • Measure the output of a PV Inverter
      • Measure the output of an AC Genset

The meter is connected to the GX device (e.g. Cerbo GX). There are two options in its wiring:

  1. Direct connection, either using the RS485 to USB interface with 1.8m cable length, or the 5.0m cable.
  2. Wireless connection via Zigbee

Victron part number REL300100000 is the ET112-DIN.AV01.X.S1.X from Carlo Gavazzi. And that is the model we keep in stock.

Other ET112 models from Carlo Gavazzi can also be used, as the communication is the same.

 

Make sure you don’t forget the Victron RS485 to USB interface Cable.

 

View Manual

Reviews

There are no reviews yet.

Be the first to review “Victron Energy Meter ET112”

Delivery Information

Enerlux manages deliveries through a combination of our own private delivery drivers and trusted national logistics partners, including companies such as The Courier Guy. The delivery method is selected based on the size, weight, and scope of the order, as well as the delivery location. All deliveries are initiated once an order has been placed, payment has been confirmed, and the order has been processed. Orders are carefully prepared, packaged, and scheduled to ensure safe handling of all electrical, solar, and energy equipment.

Delivery timelines typically range between 1 to 5 business days, depending on:

  • The size and complexity of the order
  • The selected courier or delivery method
  • Courier schedules and regional routing
  • The delivery destination

For larger, bulk, or specialised equipment orders, Enerlux may allocate dedicated delivery vehicles or adjusted logistics schedules to ensure safe transport.

Customers will be notified once dispatch has taken place, and tracking details will be provided where applicable.

Please note: Delivery timelines are estimates and may be affected by courier availability, public holidays, or unforeseen logistical delays.

Enerlux Delivery Service